Monday, July 2, 2007
Day 3
The gas work is completed today, so the stud wall between the bathroom and kitchen could come down soon.
Over the weekend, I went to the bathroom showrooms, and have decided to make changes with the layout.
It's a better layout, but this requires minimum measurement of 160cm (preferably more) horizontally. This can be done, but with the additional work on the walls.
I thought I'm good at sticking with a plan, but not sure if I can say that now.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment